Feature #11668
openSolar Design Steps (Documents, Electrical, Financial, Review) and Sub-domain Setup
Start date:
10/02/2026
Due date:
10/02/2026 (31 days late)
% Done:
90%
Estimated time:
8:00 h
Description
1. Built the Documents step of the solar design wizard.
2. Built the Electrical and Financial steps with their respective inputs and calculations.
3. Added the Review step to summarise the design before submission.
4. Configured sub-domain setup for the application.
Subtasks
Related issues