Feature #10970

open

PJM GATS — Generator Registration Stage Implementation & Technical Specification Alignment

Added by Ramu Kodali about 22 hours ago.

Status:
New
Priority:
Normal
Assignee:
Target version:
-
Start date:
09/04/2026
Due date:
09/04/2026 (19 days late)
% Done:

0%

Estimated time:
8:00 h
Spent time:

Description

Comprehensive review of the official PJM GATS (Generation Attribute Tracking System) solar photovoltaic generator registration filing documentation and end-to-end implementation of the "Register Solar Photovoltaic Generator" form within the PJM GATS project milestone stage.

Key Technical Implementation & Deliverables:
1. Form Architecture: Implemented the PJM GATS registration interface (PjmGatsApplicationForm.tsx and PjmGats.tsx) covering core regulatory sections:
- System Identification & Facility Address: Verification against interconnect utility records.
- Owner & Contact Information: Detailed multi-role tracking.
- Vintage Dates: Milestone alignment across commercial operation date and interconnection approval.
- Technical Characteristics: DC rating (kWdc), AC nameplate rating (kWac), inverter specifications, solar panel module count, tracking mechanism (fixed/tilt/axis), and degradation factors.
- Revenue-Grade Metering Information: Meter manufacturer, serial number, accuracy rating, and third-party validation flags.
- SREC-II State Certification: Program eligibility selection (SREC-II, Class I) and REC tracking setup.
2. Cross-Document Gap Closure:
- Evaluated the implementation line-by-line against PJM GATS regulatory specs and closed critical edge cases: * PJM Generator Flag toggle for grid-tied status. * Maximum Meter Read threshold validation. * Certification Type selector with dynamic requirement triggers. * Auto-Create Standing Order automated dispatch configuration. * Class I Conversion Date milestone tracking. * Third-Party Meter Reporter designation.
3. Automated Project Data Population:
- Connected form inputs to upstream project artifacts including utility bills, plan set CAD extractions, PTO (Permission to Operate) milestone dates, and client master records to eliminate manual duplicate data entry for project staff.
4. Testing & Verification:
- Validated data ingestion, dynamic field validation, schema bindings, and form persistence across frontend UI and stage workflows.